Posts

Showing posts from May, 2025

Main Beam

 

TAB Project Detail

  Total Load Main Beam A) NYS B) WIP D) Finished E) Ready For Dispatch F) Dispatched Floor Beam A) Finished B) Ready For Dispatch C) Dispatched

WORK SUMMERY

 

TAB PROJECT

1.  TOTAL LOAD 2. TOTAL MATERIAL RECEIVED 3. WORK SUMMERY

Hi

 WEL COME TO WHIPL